Describe the problem — a leaking building, a product question, or a case. Jimmy will tell you whether testing can answer it, and which protocol applies.
[city, state] · Serving [region — confirm]
Replies within [one business day — confirm].
Case discussions are confidential. A conflict check is performed before any engagement. [CV available on request — add download link]
Yes. Field testing per ASTM E1105/E783 and AAMA 502/511 is routinely performed on occupied buildings; interior protection and scheduling are part of the protocol.
Standard field tests are non-destructive. Where a forensic investigation warrants selective disassembly (removing trim or cladding to trace a water path), that scope is agreed in advance and documented.
[Typical turnaround — confirm with Jimmy] Expedited scheduling for litigation deadlines is available.
Both. The methodology is identical either way — the findings follow the evidence.